We use cookies to provide you with a better experience. If you continue to use this site, we'll assume you're happy with this. Alternatively, click here to find out how to manage these cookies

hide cookie message
Contact Forum Editor

Send an email to our Forum Editor:


PLEASE NOTE: Your name is used only to let the Forum Editor know who sent the message. Both your name and email address will not be used for any other purpose.

Tech Helproom


It's free to register, to post a question or to start / join a discussion


 

small business computer system set up


gibbs19

Likes # 0

Hi,

If one was to start a small construction business with around 10 employees. 4 office based 6 field based.

How could i tackle these challenges?

1) Hardware Choice of computers ((1)Laptop, (3)desktop, and 6)PDA's)

2) Configuration (standalone or networked, server etc.) Detail specification (CPU type/speed, amount of RAM, size of HDD, modem etc.)

3) Peripherals and networking setup Detailed


4) Software Operation system

5) General application suite



Recommendations on hardware and software should be based upon mentioned size of business.

Thanks

Like this post
wee eddie

Likes # 0

should be "Who" is going to maintain your set-up.

A freelance Engineer could do the trick, as it's unlikely to be a full time job. Just find that person and put the ball in their court.

If you parachute someone into a situation that was created without their input, you will be on the highroad to a life of excuses and denial of responsibility.

Like this post
gibbs19

Likes # 0

Thanks.

This was just a hypothetical question.

What type of equipment (specifics)would one require if they were looking at the described business plan?

Like this post
gibbs19

Likes # 0

this is a paper based project i am doing.

Like this post
wiz-king

Likes # 0

Software:-
Sage payroll for pay of workforce of 20 bodies (I know you said 10 but 4 left in the first 6 month cos they didn't like the boss)
Sage line 50 -for financial control (invoicing, purchase ledger and VAT returns)
MS office or OpenOffice for general word processing, spreadsheets, database and presentation.
AutoCAD for design & drawings
Remote access program to enable all machines to link to main desktop machine/server
Your 6 PDAs would need to be at least 10 if you want every one from the brickie upwards to have one (one was runover by JCB, one lost, one fell in the cement mixer etc0.

Like this post
gibbs19

Likes # 0

thanks wiz-king but i prefer all my employees to remain alive and kicking.

what technical name would you give to this type of hardware set up?


any more on the networking setup Detail?

cheers!

Like this post

Reply to this topic

This thread has been locked.



IDG UK Sites

Samsung Galaxy Tab S 8.4 review: The best iPad mini and Nexus 7 rival tablet around

IDG UK Sites

Which Mac? Complete Apple Mac buyers guide for 2014

IDG UK Sites

Mobile email is powerful and useful - but also hopelessly intrusive

IDG UK Sites

Samsung lights up London skyline with Midnight Rainbow