Microsoft Project 2000 (*!~*)

  BBez 19:19 11 Mar 03
Locked

Using Project 2000 to network an office block for a college project. My query is that I have several repetitions of the same hardware (e.g. 6 laptops, 6 wireless cards) which is to be entered into the "resource sheet" as a material resource.

Do I enter 6 repetitive entries into the resource sheet and assign them a "standard rate" fee or can I just input 1 entry (e.g. laptop), enter "6 required" in the resource notes and assign a "cost per use" for the outlay of purchasing the hardware.

Anyone help with this, very much appreciated...

  BBez 01:14 12 Mar 03

bump.

This thread is now locked and can not be replied to.